CNC milling · Turning · Since 1998
Tight tolerances.
Straight answers.
Precision parts in aluminum, steel, stainless, titanium and engineering plastics. Prototypes in days, production runs up to 5,000 pieces.
- Tolerance
- ±0.0005″
- Lead time
- 5–15 days
- Run size
- 1–5,000
01 / Capabilities
What we make, and how close we hold it.
Send a drawing or a STEP file. You get a price, a lead time and the name of the machinist who will run your part.
CNC milling
3, 4 and 5-axis work for complex housings, brackets and manifolds.
- Max envelope40×20×25″
- Typical tol.±.001″
CNC turning
Shafts, bushings and fittings, with live tooling for milled features.
- Max diameter12″
- Bar capacity2.6″
Prototypes
One to fifty pieces, quoted within one business day.
- Lead time3–5 days
- Min. order1 pc
Production
Repeat runs with first-article inspection and lot traceability.
- Run sizeto 5,000
- Blanket POsYes
02 / Equipment
The machines on our floor.
Every machine below is in house. Nothing on this list is subcontracted.
| Machine | Qty | Work envelope |
|---|---|---|
| 5-axis vertical machining center | 2 | 26×22×20″ |
| Vertical machining center, 4th axis | 4 | 40×20×25″ |
| Horizontal machining center | 1 | 30×28×30″ |
| CNC lathe with live tooling | 3 | Ø12×24″ |
| Swiss-type lathe | 1 | Ø1.25″ bar |
| Coordinate measuring machine | 1 | 28×40×24″ |
03 / Quality
Inspected before it ships. Every lot.
- Industrial equipment
- Medical devices
- Agriculture
- Energy
- Automation
- Drawing reviewWe flag tolerance or material issues before we quote, not after.
- First-article inspectionThe first part is measured on the CMM and the report goes to you.
- In-process checksCritical dimensions are checked at set intervals during the run.
- Final inspection and certsMaterial certs and an inspection report ship with the parts.
04 / Request a Quote
Send us your part.
01Fill in the form. Drawings can follow by email.
02We review the part and ask questions if needed.
03You get a price and lead time within one business day.